A photographic and limited measured survey carried out by A and D Graham of SyAS. Following heavy rains in December 2013 that washed away a section of the upper hammer pond dam and emptied the pond, a section through the earthwork of the dam was exposed that revealed the major elements of its construction. Evidence was recorded that suggested the dam may have been rebuilt on a number of occasions. (Bulletin 446)