Watching brief by G Rapson of MOLA during underground cabling works. The majority of the route was located on the Greensand ridge where cable was laid by mole-plough allowing limited opportunities for investigation, although worked flint dating to the Mesolithic and Neolithic periods was observed in ploughed fields. Two undated drainage features 5m apart were revealed during open-cut excavation carried out along the eastern side of Hammer Meadow, a field containing channels and earthworks relating to post-medieval water management.
Year:
2008-9
ID:
568
NGR:
TQ100471
Periods:
Borough:
Organisation: