Evaluation by Tony Champion and J Robertson of SCAU of the site of a borrow pit and tip for the M25, for Laing Civil Engineering Ltd, found that the site had been partially disturbed during the original construction of the M25. The undisturbed parts of the site revealed only various depths of colluvium over natural chalk.
Year:
1994-5
ID:
1465
NGR:
TQ263527
Borough:
Organisation: