A watching brief was carried out by J Stevenson of SCAU, for SCC, on the reconstruction of this bridge over the Wey Navigation. The bridge was last rebuilt in 1914, apparently on a slightly different alignment to the 1759 brick built bridge. This itself was likely to have replaced a timber bridge, but the watching brief revealed no evidence for this earlier structure.
Year:
1997-99
ID:
1005
NGR:
TQ017561
Borough:
Organisation: