Photographic survey and watching brief by K Bower of PCA on a section of the Railway Straight prior
to overlay resurfacing revealed details of the track construction and repair to the Scheduled racetrack.
Year:
2013-14
ID:
2251
NGR:
TQ065627
Periods:
Borough:
Organisation: